Christmas Bathroom Project



I was given a six week sabbatical in December and January from work. It was a good chance to get some things done. However, I fell deathly ill with pneumonia the very first night and so my activities were limited. We did get our bathroom sink and tub and shower area tiled. I had lots of help from Becca with the cutting. Contrary to the previous tile jobs I have done, I did all the cuts on one day and then laid the tile the next day after returning the tile saw. We think it turned out pretty well. The "tiles" are 24 inch stone squares.